000 | 02025cam a2200421 i 4500 | ||
---|---|---|---|
001 | 52975 | ||
003 | AE-DuAU | ||
005 | 20240924163433.0 | ||
008 | 190614s2019 njua b 001 0 eng | ||
010 | _a 2019024052 | ||
020 | _a9781119499831 (hardcover) | ||
035 | _a(AE-DuAU) 1121597700 | ||
040 |
_aDLC _beng _erda _cDLC _dAE-DuAU |
||
041 | _aeng | ||
049 | _aTSAUD | ||
050 | 0 | 0 | _aTH438.4.M83 2019 |
090 | _aTH438.4.M83 2019 | ||
100 | 1 |
_aMubarak, Saleh A. _q(Saleh Altayeb), _eauthor. _9206898 |
|
245 | 1 | 0 |
_aConstruction project scheduling and control / _cby Saleh Mubarak. |
250 | _aFourth edition. | ||
264 | 1 |
_aHoboken, NJ : _bJohn Wiley & Sons, Inc., _c2019 |
|
300 |
_axvii, 574 pages _bcolor illustration ; _c25 cm |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_aunmediated _bn _2rdamedia |
||
338 |
_avolume _bnc _2rdacarrier |
||
504 | _aIncludes bibliographical references and index. | ||
520 | _a"The success of Construction Project Scheduling and Control is in large part due to author Saleh Mubarak's comprehensive writing style that analyzes the complexities of scheduling through a step-by-step approach. The book introduces students to entirely new definitions and theories of the Critical Path Method (CPM), the leading scheduling method, as well as the most up-to-date information on Building Information Modeling (BIM). The new edition will include updated worked problems and scheduling software exercises, as well as revised teaching materials such as lecture slides and an instructor's manual"-- | ||
650 | 0 |
_aConstruction industry _xManagement. |
|
650 | 0 |
_aBuilding _xSuperintendence. |
|
650 | 0 | _aProduction scheduling. | |
650 | 6 |
_aConstruction _xIndustrie _xGestion. _9206899 |
|
650 | 6 |
_aConstruction _xDirection des travaux. _9206900 |
|
650 | 6 |
_aOrdonnancement (Gestion) _9206901 |
|
650 | 7 |
_aBuilding _xSuperintendence. _2fast |
|
650 | 7 |
_aConstruction industry _xManagement. _2fast |
|
650 | 7 |
_aProduction scheduling. _2fast |
|
942 |
_2lcc _cBOOK |
||
999 |
_c52975 _d52975 |