000 | 01212nam a22002657a 4500 | ||
---|---|---|---|
001 | 45969 | ||
999 |
_c45969 _d45969 |
||
005 | 20240430150039.0 | ||
008 | 180912b xxu||||| |||| 00| 0 eng d | ||
040 | _an | ||
090 | _aTHESIS 2018 SARR | ||
100 |
_aSarraf, Halim R. _925744 |
||
245 |
_aA comprehensive near-optimal, cost-based planning method for construction projects / _cby Halim R. Sarraf |
||
300 |
_axi, 112 p. : _bill. ; _c30 cm. |
||
336 |
_2rdacontent _atext _btxt |
||
337 |
_2rdamedia _aunmediated _bn |
||
338 |
_2rdacarrier _avolume _bnc |
||
502 |
_bMasters of Science in Construction Management _cAmerican University in Dubai _d2018 |
||
504 | _aIncludes bibliographical references (pages 105-112). | ||
520 | _aThis study looks at a comprehensive near-optimal, cost-based planning method for construction projects in the United Arab Emirates. | ||
650 |
_aPlanning and Scheduling for Construction Projects _936038 _zUnited Arab Emirates |
||
650 |
_aFactor Affecting Planning and Scheduling _936039 _zUnited Arab Emirates |
||
856 |
_uhttps://dspace.aud.edu:443/jspui/handle/123456789/78 _z(AUD Theses and Dissertations Collection) Connect to this title online |
||
942 | _cTHESIS | ||
907 | _a45969 |