000 | 03220cam a22004574i 4500 | ||
---|---|---|---|
001 | ocn863789826 | ||
003 | OCoLC | ||
005 | 20240430145715.0 | ||
008 | 140127s2014 nyuab b 001 0 eng | ||
010 | _a 2013044634 | ||
016 | 7 |
_a016761157 _2Uk |
|
020 |
_a9781138016156 _q(paperback) |
||
020 |
_a1138016152 _q(paperback) |
||
020 |
_a9781315776101 _q(ebook) |
||
020 |
_a1315776103 _q(ebook) |
||
029 | 1 |
_aAU@ _b000052493887 |
|
029 | 1 |
_aCHBIS _b010335732 |
|
029 | 1 |
_aCHVBK _b333139089 |
|
029 | 1 |
_aNZ1 _b15653433 |
|
035 | _a(OCoLC)863789826 | ||
040 |
_aDLC _beng _erda _cDLC _dYDX _dYDXCP _dBTCTA _dUKMGB _dBDX _dCDX _dOCLCO _dOCLCQ _dOCLCO _dOCLCQ |
||
042 | _apcc | ||
049 | _aTSAA | ||
050 | 0 | 0 |
_aTH438.15 _b.P37 2014 |
090 | _aTH 438.15 .P37 2014 | ||
100 | 1 |
_aParker, Donald E. _q(Donald Elmer), _d1946- _94165 |
|
245 | 1 | 0 |
_aParametric cost modeling for buildings / _cDonald E. Parker. |
264 | 1 |
_aNew York : _bRoutledge, _c2014. |
|
300 |
_axiii, 170 pages : _billustrations, map ; _c24 cm |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_aunmediated _bn _2rdamedia |
||
338 |
_avolume _bnc _2rdacarrier |
||
504 | _aIncludes bibliographical references and index. | ||
520 | _a"Successful value engineering in construction is based on accurate and early estimations of cost, and this book is the quickest route to creating one from scratch. The budgeting system described in this book will help the reader to: - document project scope at a level that provides excellent cost control at design stage - establish the parameters of potential sites before selecting one - determine the amount of financing needed before deciding to bid on a project - make a detailed and robust building project budget - determine the rental rate necessary to see if a building project will be marketable The technique used is a parametric cost system, not the square foot cost system used by most who quote an up-front building cost. To help calculate the parameter quantities and price them as quantified, this book comes with 5 electronic templates to calculate program scope; i.e. - space, configuration, HVAC loads, plumbing and electrical. It also includes: - the author's parametric cost database and cost template to prepare the construction estimate - a soft cost template to price out all related program costs, convert them to a monthly cash flow, incorporate financing costs and then reveal the final budget - an operation and maintenance cost template to calculate those variable and fixed costs necessary to run the building and then convert the result into the necessary rental rate to capitalize all costs The spreadsheets, data, advice, and templates, are all introduced through a detailed case study, placing everything in an easy to understand practical context. This will prove an invaluable guide not only for estimators and cost engineers, but also developers, clients, and architects"-- | ||
650 | 0 |
_aBuilding _xEstimates _xData processing. _94166 |
|
650 | 0 |
_aBuilding _xCost control _xMathematics. _94167 |
|
650 | 0 |
_aParameter estimation. _94168 |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING _xConstruction _xGeneral. _2bisacsh _94169 |
|
942 |
_2lcc _cBOOK |
||
999 |
_c42397 _d42397 |
||
907 | _a42397 |