000 02877cam a2200325La 4500
001 ocn435994279
003 OCoLC
005 20240430145257.0
008 090907s2009 caua b 001 0 eng d
020 _a9781935401001 :
_c39.95
020 _a1935401009 :
_c39.95
035 _a(OCoLC)435994279
040 _aNz
_beng
_cUW1
_dYDXCP
_dEEK
_dERE
_dDEBSZ
_dOCLCQ
049 _aTSAA
050 1 4 _aHF5415.15
_b.R445 2009
090 _aHF 5415.15 .R445 2009
090 _aHF 5415.15 .R445 2009
100 1 _aReinertsen, Donald G.,
_d1950-
_9140078
245 1 4 _aThe principles of product development flow :
_bsecond generation lean product development /
_cDonald G. Reinertsen.
260 _aRedondo Beach, Calif. :
_bCeleritas,
_cc2009.
300 _aix, 294 p. :
_bill. ;
_c24 cm.
505 0 _a1. The principles of flow. What is the problem? -- A possible solution -- The relevant idea sources -- The design of this book -- It will be a long journey, so start now -- 2. The economic view. The nature of our economics -- The project economic framework -- The nature of our decisions -- Our control strategy -- Some basic economic concepts -- Debunking some popular fallacies -- Conclusion -- 3. Managing queues. Queueing theory -- Why queues matters -- The behavior of queues -- The economics of queues -- Managing queues -- Roundup up the usual suspects -- Conclusion -- 4. Exploiting variability. The economics of product development variability -- Reducing variability -- Reducing economic consequences -- Conclusion -- 5. Reducing batch size. The case for batch size reduction -- Software testing example -- The science of batch size -- Managing batch size -- Round up the usual suspects -- Conclusion -- 6. Applying WIP constraints. The economic logic of WIP control -- Reacting to emergent queues -- Examples of WIP constraints -- WIP constraints in practice -- Conclusion -- 7. Controlling flow under uncertainty. Congestion -- Cadence -- Cadence in action -- Synchronization -- Sequencing work -- Managing the development network -- Correcting two misconceptions -- Conclusion -- 8. Using fast feedback. The economic view of control -- The benefits of fast feedback -- Control system design -- The human side of feedback -- Metrics for flow-based development -- Conclusion -- 9. Achieving decentralized control. How warfare works -- Balancing centralization and decentralization -- Military lessons on maintaining alignment -- The technology of decentralization -- The human side of decentralization -- Conclusion.
504 _aIncludes bibliographical references and index.
650 0 _aProduct management.
_9140079
650 0 _aNew products.
_9140080
907 _a37580
_b12-12-12
_c12-12-12
942 _cBOOK
_00
998 _aaudmc
_b12-12-12
_cm
_da
_e-
_feng
_gcau
_h4
945 _g0
_i5081939
_j0
_laudmc
_o-
_p147.00
_q-
_r-
_s-
_t1
_u0
_v0
_w0
_x0
_yi14897581
_z12-06-12
999 _c37580
_d37580