TY - BOOK AU - Sarraf, Halim R. TI - A comprehensive near-optimal, cost-based planning method for construction projects KW - Planning and Scheduling for Construction Projects KW - United Arab Emirates KW - Factor Affecting Planning and Scheduling N1 - Includes bibliographical references (pages 105-112) N2 - This study looks at a comprehensive near-optimal, cost-based planning method for construction projects in the United Arab Emirates UR - https://dspace.aud.edu:443/jspui/handle/123456789/78 ER -